Job costing

What did that job really cost? Answered without a timesheet.

MRPLight already knows which material a job took and how long it was worked on at each station. Cost is those two numbers multiplied out.

Material from the recipe

Each job takes the material its product's recipe lists, at the cost of the last delivery. The job record shows every line and the total.

Labor from the scans

Working time is the time between Start and Done at each station. Multiply by your shop's hourly rate and you have labor cost, with no clock-in screen and no paper travelers to add up.

  • One shop rate to start, set in a single field
  • Cost per piece as well as per job
  • Run time per station against what is usual for that station

Quote the next one better

Product pages show material cost per unit and the recent jobs that made it. When a job ran long you see which station it was, which is usually the part of the quote that was wrong.

Questions

Is the labor figure exact?

It is as good as the scans. A job left in progress overnight will show more time than it took. For most shops it is far closer than the estimate they quote from today.

Does it replace accounting software?

No. It does not invoice or keep books. It tells you what jobs cost to make, which is the number accounting software usually lacks.

More: job shop tracking, simple mrp, raw material inventory, or pricing.

Walk through a working shop before you talk to anyone.

The demo shop has eleven weeks of jobs, scans and material in it. Nothing to install and no form to fill in.